ÒÎÎ "Caspian Engineering & Research"  
 
 
 
 
       
 

1. KPO b.v. (Karachaganak Field)

2. Agip KCO (Kashagan, Kalamkas-Sea Fields)

3. Saipem (Kashagan Field)

4. Consafe McNulty JV Limited (Kashagan Field)

5. NCPOC

6. NCOC

7. TCO (Tengiz Field)

8. Kazakhoil Aktobe (Alibekmola Field)

9. Buzachi Operating (North Buzachi Field)

10. Zhaikmunay (Chinarevskoye Field)

11. KazGerMunay (Akshabulak Field)

12. MangistauMunayGas

13. Maersk (Dunga Field)

14. Karakudukmunay (Karakuduk Field)

15. Ken-Sary, LLP (Arystanovskoye)

16. KarazhanbasMunai (Karazhanbas Field)

17. KazMunayGas

18. Fuel and Energy Complex (TEK) in RK

19. Technip Germany Gmbh

20. CPC Pipeline

21. TenizService

22. KazMunayTeniz

23. PKOP, Honeywell-ACS (SHNOS)

24. Ministry of Energy and Mineral Resources (MEMR)

25. KCOI (Support Base)

26. NefteStroyServis LTD, LLP

27. Oil Transport Corporation LLP

KPO b.v. (Karachaganak Field)

  • Consulting and Engineering Services for Development of Project 

  • Documentation, Permitting and Certification Packages related to the 4th

  • Stabilization and Sweetening Train and Associated KPC Infrastructure – TPD

  • Package and Detail Design for Construction of the 4th Train of Condensate

  • Stabilization and Gas Processing;

  • Declaration of Intent, Feasibility Study and Environmental Impact Assessment 

  • for the 4th Stabilization and Sweetening Train and Associated KPC

  • Infrastructure Project;

  • The 4th Stabilization and Sweetening Train - TPD & Detail Design;

  • Author’s Supervision for 4th Train Construction;

  • Declaration of Intent for Investment in Construction of Condensate/LPG Loading

  • Racks;

  • Feasibility Study and Preliminary Environmental Impact Assessment for the

  • UGP Project;

  • Declaration of Intent, Investment Substantiation and Preliminary Environmental

  • Impact Assessment for the Karachaganak Development Phase III Project;

  • Permitting for Start-Up of EOPS, Unit-2, KPC and Associated Process and

  • Utilities Areas in the Karachaganak Field;

  • The 4th Train at KPC. 10'' NGL Pipeline from EOPS to Unit-3;

  • The 4th Train at KPC. 14'' Condensate Pipeline from Unit-3 to KPC;

  • Preparation of isometric drawings

  • Preparation of Piping Passport of Karachaganak 4th Train Project for 10” Nature Gas Condensate Pipeline and 14” Condensate Pipeline

  • Preparation of Technical Regulations



  • Agip KCO (Kashagan, Kalamkas-Sea Fields)

  • Optimization of Kashagan FFD Permitting/Approval Process ;

  • Optimization and Selection of Long-term Sulfur Management Concept;

  • EP Kashagan Raw Gas Injection Project;

  • Declaration of Intent for Kashagan FFD OPF Construction;

  • Caspian Region Infrastructure Study for FFD Logistics;

  • Preparation of Technical Documentation and Engineering Support for Kashagan EP RGI Project;

  • Conceptual Engineering and Field Survey for Tie-in to KTO Pipeline on the Buzachi Peninsula for Kalamkas Oil Export;

  • Engineering Design and Survey for the Social Infrastructure Projects;

  • Gas Utilization Program;

  • Technical Substantiation of the Kashagan FPD (Further Phases of Development) Facilities Construction;

  • EP OPF Facilities Tranche 3;

  • Project Documentation for Construction of Drilling Centers DC-1, DC-4, DC-6, DC-7;

  • Gap Analysis (Compliance of Detail Design (AFC status) with approved Projects (TPD) for Kashagan Field Development - Experimental Programme)

  • Project update, Defining of Start-Up Complexes and Author supervision:
    • “Kashagan Field Development EP. Offshore. Process Facilities”

    • “Kashagan Field Development EP. Onshore. OPF. Update of Tranches 1, 2, 3”



    Saipem (Kashagan Field)

  • Review and Development of Pre-FEED, Detail Design and Onshore Survey 

  • Kashagan-Eskene Offshore Trunklines (100 km oil, gas and fuel gas lines)

  • Consafe McNulty JV Limited (Kashagan Field)

  • “Accommodation  Barges No. 11, 12"

  • NCPOC

  • External Power Networks for Koshanai Objects. Conceptual Design

  • Earth Depth Monitoring Stations Detail Designs and EIA in Atyrau and Mangistau regions

  • NCOC

  • Preparation of Development Program for Gas Processing for 2012-2015.

  • TCO (Tengiz Field)

  • Sulfur Storage Pilot Project

  • Declaration of Intent for Investment in Construction and Environmental Conditions Overview on the Future Growth Project

  • Feasibility Study and Pre-EIA on the Future Growth Project

  • Consulting Services for Drawing up a Register of Regulatory Documents and for Construction of TGP Modules

  • Consulting services on normative legal regulation for Tengiz Field Future Growth Project 



  • Kazakhoil Aktobe (Alibekmola Field)

  • Detail Design for Alibekmola Field Surface Facilities Construction at

  • Operation and Maintenance Phase:
      • Reservoir Pressure Maintenance System;

      • Central Oil and Gas Plant (export oil capacity upgrade up to 3 MMt/a);

      • Central Oil and Gas Plant Utilities;  

      • Fuel Gas Treatment Unit.
  • Facilities Construction Management;

  • Author’s Supervision for Construction & Installation Operations;

  • Engineering & Consulting Services for Client and EPC Contract Parties;

  • Alibekmola and Kozhasai Fields Development Project – Feasibility Study

  • (TEO);

  • Justification of Investment (JI) in Construction of Alibekmola and Kozhasai Associated Gas Utilization Facilities - Consulting Services for KOA LLC in the course of JI Development by LenNIIChimmash OJSC and Outcome Review;

  • Alibekmola and Kozhasai Associated Gas Utilization Program;

  • TPD and author supervision “Alibekmola Field Surface Facilities Construction Project on Updated Field Development Scheme”;

  • TPD and author supervision “Sales Gas Pipeline from Alibekmola Gas Treatment Unit-50 to Main Gas Pipeline”.







  • Buzachi Operating (North Buzachi Field)

  • Field Surface Facilities Construction at Pilot Development Stage;

  • Volga Water Pipeline and Storage Tank Construction Project;

  • Design and Estimate Documentation on the Project: MTO, Construction & Start-Up of 4 RPMS Heaters and Associated COPS Facilities;

  • Buzachi Field Surface Facilities Construction at Operation & Maintenance Phase up to 2021.Conceptual Design

  • Design & Survey Work and Author Supervision for Construction of Gas Treatment Facility, Compressor Station, Support Equipment and Utilities on North Buzachi field. Construction of North Buzachi-Karazhanbas Gas Pipeline

  • Development and Approval of Detail Designs and EIA (Environment Impact Assessment) of “North Buzachi Field Expansion of PWRU-1” (Preliminary Water Removal Unit) and “North Buzachi Field Construction of PWRU-2”’. Author’ supervision

  • Zhaikmunay (Chinarevskoye Field)

  • Oil & Gas Processing Plant - TPD and Detail Design;

  • Chinarevskoye OGCF to Rostoshi Oil Pipeline - TPD and Detail Design;

  • Oil Demercaptanisation Unit - Detail Design;

  • Author’s Supervision for Construction;

  • Design and Estimate Documentation for Construction of LPG Rail Terminal.



  • KazGerMunay (Akshabulak Field)

  • Technical & Economical Justification of LPG Transport

  • COPS Gas Dehydration and Condensate Gathering - Detail Design

  • Author’s Supervision for Construction

  • COPS Extension Project

  • MangistauMunayGas

  • PWDU TPD and Detail Design

  • Permitting Package and Detail Design for Construction of Kalamkas Gas Treatment Unit 

  • Author’s Supervision for Construction

  • Zhetybai Field Gas Utilization Program



  • Maersk (Dunga Field)

  • Treatment of Associated Gas in the Dunga Field – TPD, Detail Design and EIA

  • Well Equipment Installation and Oil Gathering & Transport System Upgrade in the Dunga Central Gathering Facility - Author’s Supervision 

  • RPMS Pipelines

  • P&IDs for the existing Process Equipment and Pipelines

  • TPD and Detail Design, Author’s Supervision, permitting with State Bodies as well as preparation of As built documentation for Dunga  Full Field Development Infrastructure

  • Karakudukmunay (Karakuduk Field)

  • Oil & Gas Gathering and Processing System Upgrade – Detail Design

  • Central Oil Treatment Plant Upgrade Project - Detail Design

  • Associated Gas Utilization Program

  • Associated Gas Utilization Facilities Construction Project – TPD and Detail Design

  • Author’s Supervision for Construction of Associated Gas Utilization Facilities, Oil Gathering and Processing System

  • Ken-Sary, LLP (Arystanovskoye)

  • Development of TPD "Arystanovskoye Field Gas Treatment Facility" with EIA"

  • KarazhanbasMunai (Karazhanbas Field)

  • Oil and Gas Gathering and In-field Transport System – TPD and Detail Design

  • Stage-2 Construction of Modular Group Pumping Station within Booster

  • Pump House-2 – Author’s Supervision

  • Design and Estimate Documentation for Karazhanbas Field Facilities

  • Construction

  • KazMunayGas

  • Development of Onshore Infrastructure in the Kazakh Sector of the Caspian Sea (KSCS)

  • Fuel and Energy Complex (TEK) in RK

  • Expansion of fuel storage at stations, TEK-Kazakhstan LLP. Detail Design:

  • Fuel storage at Atyrau Station (expansion)

  • Fuel storage at Beyneu Station (expansion)

  • Technip Germany Gmbh

  • Technical & Economical Feasibility Study for Eskene West to Kuryk Pipeline

  • CPC Pipeline

  • Expansion of CPC in RK. Detail Design (Atyrau Pump Station, 116-204 km Pipeline).

  • Expansion of CPC in RK. 0-116 km Pipeline Construction - TPD.

  • TenizService

  • Marine Petroleum Operations Support Base in Bautino – Detail Design;

  • Toxic Industrial Waste Landfill including Oily Water Treatment Unit – TPD and Detail Design.

  • KazMunayTeniz

  • Risk Analysis for EP Kashagan Offshore Facilities;

  • Kalamkas- Sea Field Development Concept.

  • PKOP, Honeywell-ACS (SHNOS)

  • Feasibility Study and Pre-EIA for PKOP Shymkent Refinery Upgrading Project.

  • Ministry of Energy and Mineral Resources (MEMR)

  • State Review (RoK Government Order No.1280 of 24.12.07 On CER Appointment as State Expert) of Bid Proposals for Concession Project of Infrastructure Facilities Development at Atyrau Integrated Petrochemical Complex.

  • KCOI (Support Base)

  • Industrial Yard of Sea Metal Structures Fabrication with Quay in Tyub-Karagansky Region in Mangistau Oblast – TPD, Detail Design and Author supervision.

  • NefteStroyServis LTD, LLP

  • Detail Designs for construction of Production Base for 250 units of vehicles in Karazhanbas field and for 100 units of vehicles in Kalamkas field

  • TPD and Detail Design for “Auto Service Center for 1000 Units of Vehicles in Uzen Field”

  • Oil Transport Corporation LLP

  • Detail Design “Construction of Production Base for 600 Units of Vehicles in Kalamkas Field”
  • up
     
     
    © 2017 "Caspian Engineering & Research" LLP