Designing the future,
entrust the work to professionals!

Kashagan field

NCOC N.V., NCPOC, Agip KCO (Kashagan, Kalamkas Sea)

  • Raw gas injection project at EP stage (2005)
  • Development and approval of Declaration of Intentions for Kashagan FFD OPF Construction (2006)
  • Project engineering of “Caspian Region Infrastructure Study to choose Logistics option for FFD (2006-2007)
  • Preparation of Technical Documentation and Engineering Support for RGI Project (2007-2010)
  • Development and approval of “Feasibility study of Further Development Phases Facilities Construction at Kashagan field” (2008-2009)
  • Development and approval of “EP Facilities development. Tranche 3” (2008-2009)
  • Project engineering of DC-1, DC-4, DC-6, DC-7 Drilling Islands Construction (2008-2009)
  • Development and approval of “EP Gas Utilization Program” (2008-2011)
  • Project engineering of “Compliance Analysis of approved Projects Detail Design “EP Kashagan Field. Onshore.” (2010-2011)
  • Development and coordination of DD “Kashagan Field Development EP. Onshore. OPF. Unit 560 (separation of oily water from produced water)”. (2016-2017)
  • Kashagan Field Development EP. Offshore. Installation of additional breathing cylinders for residential air control system (2016)

NCOC N.V., PSN Kazstroy JSC (Kashagan)

  • Project update including Start-Up Complexes and Author supervision:
  • “Kashagan Field Development EP. Offshore. Process Facilities” (2011-2018)
  • “Kashagan Field Development EP. Onshore. ” (2011-2018)
  • Preparation of Development Program for Gas Processing (2008-2018)
  • Development and coordination of Earth Depth Monitoring Stations Detail Designs and EIA in Atyrau and Mangistau regions (2012-2015)
  • Development and coordination of DD “Kashagan Field Development EP. Onshore and Offshore wash bays” (2017-2018)
  • Development and coordination of the “Kashagan Field Development EP. Onshore. OPF. Update of Tranche 1, 2, 3 including Start-up complexes. Upgrade” (2017-2018)
  • Author supervision of facilities construction (2017-2018):
    • Gas turbine generator
    • Sulfur storage
    • Kashagan Field Development EP. Export oil and gas pipelines

Saipem (Kashagan)

  • Review and Development of Pre-FEED, Detail Design and Onshore Survey (2005-2006)
  • Kashagan-Eskene Offshore Trunklines (100 km crude oil, gas and fuel gas pipelines) (2006-2009)

Consafe McNulty JV Limited (Kashagan)

  • Project engineering of “Accommodation Barges # 11, 12” (2005-2006)