Petrochemical Projects
Almex Petrochemical LLP
- Feasibility Study (TEO) of the Project “Production of Purified Terephtalic Acid and Polyethyleneterephthalate” (2016-2017)
PKOP LLP, “Honeywell-ACS” JSC (ShNOS)
- Feasibility Study and Pre-EIA of “Shymkent Refinery Modernization and Reconstruction Project” PKOP LLP (2009)
RoK Ministry of Energy and Mineral Resources
- Evaluation and expert examination of the bids for the Concession Project “Infrastructure Facilities of the Integrated Petrochemical Complex in Atyrau Region” (2007)
Foster Wheeler Energy Ltd
- Engineering services for the Project “Integrated Petrochemical Complex”. Feasibility Study (2006)
“Atyrau Refinery” LLP, JGC Atyrau Branch (Atyrau Refinery)
- Development of design and estimates documentation of Atyrau Refinery upgrade, Atyrau Refinery infrastructure facilities (2004-2006)